Project for location of marks for observation over scheduled shifting motion of bulkhead walls of 2 level of conduit intake
Capacity (if HPP)
1 phase: 1200t/1320н MW;
2 phase: 840t/1000н MW
Description of the performed works
1. Pre-project inspection – with geodetic survey execution
2. Development and approval of technical requirements by the Customer for design following the results of pre-project inspection;
4. Development of design documentation consisting of:
Section 1. Explanatory note.
Section 2. Constructional and layout and arrangement»
(composition, description and scope of works).
Section 3. Construction management plan.
Section 4. Environmental management.
Section 5. Fire safety measures.
Section 6. Estimate documents at basic prices of 2001 .
5. Approval of design documentation.
6. Development of working documentation.