Feasibility study (feasibility study) with a variant study of the reconstruction of the hydro unit № 24 of Kama HPP
Power (If HPP): 552 MW
Characteristics of the performed work:
Surveys of the hydro unit № 24 and its auxiliary equipment for building construction design and base parts to collect information and determine the amount of equipment replacement were carried out.
Variant elaborations of reconstruction of the hydro unit №24 with the preparation of a feasibility study for each option, taking into account the state of the equipment being replaced.
- Explanatory notes were developed for each option, containing the technical and economic advantages and disadvantages of each of the options considered.
- Technologies of multidimensional information modeling are used to determine the scope of work for a variant study of the reconstruction of the hydro unit №24 of the Kama HPP.
- The feasibility study of the final variant of the reconstruction of the hydro unit №24, which includes a consolidated cost estimate and a specification for equipment and materials as well as the total projected costs, was developed.