Installed capacity - 50 MW (2 hydro units with a capacity of 25 MW)
Hydromechanical equipment:
- Development of Project and Working documentation for hydromechanical equipment.
- Manufacturing and supply of hydromechanical equipment of HPP.
- Installation work on hydromechanical equipment.
Pre-installation work on the main equipment:
- Installation of a draft tube and embedded pipes
- Installation of the spiral casing and embedded pipes