Country: Angara River, Boguchansky district, Russia
Year of ending: 2023- present
Capacity:
- installed capacity 660 MW;
- available capacity 600 MW;
- guaranteed capacity 200 MW;
- average long-term electricity generation 3.3 billion kWh;
Scope of works:
- Draft design of the HPP hydromechanical equipment in a volume sufficient to select the necessary hydromechanical equipment.
- Types of hydromechanical equipment from various suppliers elaboration.
- Recommendations for the selection of hydromechanical equipment recommended for purchase, with a preliminary assessment of the cost of the equipment.