Capacity (if HPP) 204 MW
Performed work description
Purpose of the present work was to determine actual state of reinforced concrete structures of the erection site in the area of a load falling with development of suggestions on strengthening of concrete structures Alluriquin HPP erection site
Tasks:
collection of background information, engineering design documentation, conclusions with following analysis and development of work program;
determination of actual state of reinforced concrete structures by means of visual and tool inspection, including selective determination of true stress in fittings by means of «unloading of fittings»;
estimation of actual strength characteristics of concrete by means of nondestructive testing;
conducting of calculation studies of actual strain-stress state of concrete structures of the erection site in the area of a load falling;
development of principled proposals for strengthening of concrete structures of erection site in the area of a load falling with justifying calculations.