Country: Armenia, Metsamor, Armenian Nuclear Power Plant
Year of ending: 2024
Overhaul of TG-3 turbogenerator and medium repair of TG-4 turbogenerator of TVV-220-2EU3 type at Armenian NPP during the period of the Work Execution Design -24.
Capacity:440 MW